Submitting a Pearl Rating Application
All relevant new projects must achieve a minimum 1 Pearl rating
to receive approval from the planning and permitting authorities.
Government funded projects must achieve a minimum 2 Pearl
rating.
Registration of projects for Pearl Ratings with UPC is not
required at present. A formal registration process will be in place
in the future.
The submission requirements for the design and construction
stages of the Pearl Rating System (PRS) are outlined in each
credit. The Design Rating application is linked with the building
permitting process at the relevant Municipalities and must be made
at the end of the construction documentation stage. The
Construction Rating application must be made on completion of
construction.
Any building and villa project located within a proposed Pearl
rated community must demonstrate an integrated approach between the
PCRS application and the PBRS/PVRS application(s). The PCRS
application must be submitted and approved before NOPC letters can
be issued for the individual project villas and/or buildings.
Confidentiality
There will be no public disclosure of information provided as
part of the Submission Requirements. Information provided will
remain confidential, except as required for identification of the
project and its key participants for the purposes of providing
Certification.
Correspondence Protocol
Project Specific Estidama Correspondence
All project specific Estidama correspondence
must be addressed to the following:
Estidama Program
Manager
Development Review
& Estidama
Abu Dhabi Urban
Planning Council
7th Floor
Al Mamoura B Building
Note: All correspondence submitted must be
signed by the appointed PQP for the project or the company
authorized signatory.
Non-Project Specific
Correspondence
All non-project specific Estidama
correspondence must be addressed to the following:
Mohamed Al Khadar
Executive
Director
Development Review
& Estidama
Abu Dhabi Urban
Planning Council
7th Floor
Al Mamoura B Building
Note: All correspondence submitted must be
signed by the company authorized signatory.
Design Rating Application
From 1 June 2011, all PRS submittals must be done by a certified
PQP in the applicable rating system.
All applicable Community, Building and Villa projects must
submit the Design Rating Application to UPC following the
instructions below:
From 1 June 2011, all PRS submittals must be done by a certified
PQP in the applicable rating system.
1. Download the submittal
template and the accompanied submittal guide for either a
Community, Building or Villa project.
2.Download the latest versions of ALL calculators applicable to
the project from the Estidama website.
3.Complete the submittal template and upload all the supporting
documents, such as narratives, drawings, specifications,
calculators etc within the relevant credit folders. Project
submittals must be complete. If a project is 2-5 Pearls, then the
submittal must be complete before UPC will start the
evaluation.
4.Print or attach the "Project Information" tab of the submittal
template to a cover letter. Ensure this cover letter is prepared in
accordance with the Correspondence Protocol
outlined above and also includes the project Community ID, Plot ID,
and Building ID for geo-tagging purposes.
5.Copy the submittal template (including folder structure with
all supporting documents) onto a CD.
6.Submit both the CD and two copies of the cover letter/Project
Information sheet to UPC, one of which will be stamped as
confirmation of receipt. Directions to the UPC are available here.
Note that the Estidama team is on the 7th floor. Submissions are
only received between 8:30am and 4:30pm Sunday to Thursday.
Please note that projects requiring Development Review must not
submit for a PRS Design Rating until they have received their
Detailed Planning Approval letter. See Estidama and Development
Review for details about the Development Review process.
UPC Pearl Rating System Review Process
Following submission of the Pearl Rating application to UPC, the
Estidama team will review the application and provide feedback and
comments to both the project PQP/PVRS Professional and to the
project owner. The flow chart below illustrates the review process
for projects aiming for minimum 1 Pearl (privately funded) or
minimum 2 Pearl (government funded) rating.
The UPC team is available throughout the review process to help
project teams in obtaining rating approvals in no more than two
submissions over a period of less than two months.

Estidama envisions recognition of projects achieving 2-5 Pearls
at Design Stage; the details of that recognition are being
determined at present and once completed will be posted here.
Construction Rating Application
Projects that have received a Pearl Design rating and are under
construction are required to submit a Pearl Construction Rating
application after construction is completed. At this point the
Pearl Design Rating will expire and will be superseded by the
Construction Rating.
The Construction Rating application follows the same process as
the design one. Project teams can update the previously submitted
templates including a concise description of the changes that
occurred between obtaining the design rating and completion of
construction. The instructions of the
submission process are outlined above.
Currently, all Construction Rating applications must be
submitted to the UPC.